Uganda, Gaba III Water Treatment Plant

Gaba III Water Treatment Plant

The extra production capacity will provide relief from the general water shortage in the area. It is estimated, that this extra production capacity will cover the projected water demand of the coming 5 to 10 years. It will particularly improve the water supply to the low income housing areas.

ClientNational Water and Sewerage Corporation, Uganda
Financing AgencyKfW, Germany
LocationGaba, Kampala, Uganda
Services Period2002 – 2013
Project Cost145 million EUR
Technical Data
  • Clear Water Production
925 l/s
  • Raw Water intake
1065 l/s
Services
  • Review of contractors designs and preparation of environmental impact assessment report (pre-construction period)
  • Supervision of Construction (Construction period) and
  • Superintendence over the one year Defects Liability Period

NEWS

April 18th, 2024

We are excited to be part of #IFAT Munich

We are excited to be part of #IFAT Munich – the World's Leading Trade Fair for #Water, #Sewage,…

April 1st, 2024

Transition in management at GKW Consult

After a long career of almost 40 years, Dr. Christoph Theune retires on 31st of March 2024.…

January 29th, 2024

“La Atarjea” Wastewater Treatment Plant

GKW Consult GmbH (GKW) and its local consortium partner Agua Energía y Minería (AEM) (former…