Kenya, Technical Assistance to Coast Water Service Board, "Mwache Project", Mombasa

The project objectives aimed at reducing the water shortage in Likoni (South Mombasa). The assignment focused on short-term increase of water availability before the implementation of the Mwache (dam) project and consisted in study, design, procurement and supervision of works, including hydrogeological investigations of the Tiwi aquifer, to establish the optimum capacity of the well field and optimum well field operations, detailed inspection rehabilitation of existing boreholes, drilling of new boreholes and study and design of desalination units for treatment of brackish ground water (10,000 m³/d).

Services

  • Study and design to increase the yield of the Tiwi well field
  • Improve the capacity of the system up to 5,000 m3/d
  • Design and construction 14  groundwater boreholes (60 m3/h)
  • Study and design of desalination units for treatment of brackish ground water (10,000 m3/d)

Technical Data

  • 14  ground water boreholes (60 m³/h)
  • Desalination units for treatment of brackish ground water (10,000 m³/d)

Client / Financing Agency

  • Coast Water Works Development Agency (CWWDE)
  • World Bank, Washington

Services Period

2018 - 2019

 

 

 

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…