Romania, Technical Assistance for five Counties

The objective of the project was to ensure compliance with the national and EU legislations within the transition periods agreed between Romania and the EU for the environmental sector, assistance to the project promoters in developing local capacity for future project development and the definition of a long term phased investment programme.

The project included the following activities:

  • Selective collection, collection, transfer and transport (14 transfer stations, 25 civic amenity sites) and storage of solid residues
  • Set-up and management of adequate waste treatment and disposal facilities (6 new ecological landfills, 1 compost facility, 5 sorting plants, etc.)
  • Improvement of the environmental situation by closure of inappropriate waste deposits (22 landfills and about 1,200 dumpsites)
  • Institutional strengthening by forming of Intercommunity Development Associations, adjustment of Romanian legislation and capacity building
ClientCentral Finance and Contracts Unit, Romania
Financing AgencyEuropean Commission, Belgium
LocationBotosani, Calarasi, Olt, Suceava, Vaslui, Romania
Services Period2007 – 2011
Project Cost146 million EUR
Technical Data
  • Total area
29,000 km²
  • Inhabitants
2.9 million
Services
  • Location and geological-geotechnical-hydro geological investigations of six landfill sites
  • Development of master plans, macro affordability assessments, institutional analysis and improvement
  • Procurement strategies, feasibility studies, financial and economic analysis and EIA for Botosani, Calarasi, Olt, Suceava and Vaslui counties
  • Preparation of five applications for EU co-financing and supporting documents, detailed design and tender documents (FIDIC)

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…