Wastewater

Hungary, Wastewater Treatment Plant Budapest

Within the scope of the project a WWTP has been constructed with an average daily capacity of 300,000 m³/d and with secondary and partial tertiary treatment.more


Thailand, Bangkok Wastewater Project, Stage IV

The scheme included a WWTP with sludge treatment facilities to treat a dry weather flow of 150,000 m³/d and serve an existing population of ca. 550,000, plus industrial wastewater and infiltration summing up to a PE of 1 million at an average flow of 150 l/h/d. more


Turkey, Wastewater Treatment Plant Ankara, BOT

Private sector participation for the extension of the existing wastewater Treatment Plant to full capacity (year 2025) and operation of the plant for a period of 15 years under a BOT contract.more


Displaying 15 to 17 of 17
<< First < Previous 1-7 8-14 15-17 Next > Last >>

NEWS

April 18th, 2024

We are excited to be part of #IFAT Munich

We are excited to be part of #IFAT Munich – the World's Leading Trade Fair for #Water, #Sewage,…

April 1st, 2024

Transition in management at GKW Consult

After a long career of almost 40 years, Dr. Christoph Theune retires on 31st of March 2024.…

January 29th, 2024

“La Atarjea” Wastewater Treatment Plant

GKW Consult GmbH (GKW) and its local consortium partner Agua Energía y Minería (AEM) (former…