Wastewater

Hungary, Wastewater Treatment Plant Budapest

Within the scope of the project a WWTP has been constructed with an average daily capacity of 300,000 m³/d and with secondary and partial tertiary treatment.more


Thailand, Bangkok Wastewater Project, Stage IV

The scheme included a WWTP with sludge treatment facilities to treat a dry weather flow of 150,000 m³/d and serve an existing population of ca. 550,000, plus industrial wastewater and infiltration summing up to a PE of 1 million at an average flow of 150 l/h/d. more


Turkey, Wastewater Treatment Plant Ankara, BOT

Private sector participation for the extension of the existing wastewater Treatment Plant to full capacity (year 2025) and operation of the plant for a period of 15 years under a BOT contract.more


Displaying 15 to 17 of 17
<< First < Previous 1-7 8-14 15-17 Next > Last >>

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…