The WWTP San Rocco is designed to treat the wastewater of 700,000 PE and a maximum flow of 900,000 m³/d. The effluents are rejected about 2 km downstream into the river Lambro. As the Lambro is a tributary to the river Po that leads into the Adriatic Sea, it is declared as sensitive water body. This means that the effluent of the WWTP has to meet strict effluent values.

The plant has been constructed in 1965 and constantly been extended and rehabilitated during the last 30 years. Latest rehabilitation measures executed were the complete reconstruction of the mechanical pre-treatment except from the primary sedimentation in 2010 and the new construction of an additional sludge treatment step (Biothelis process).

The treatment process consists of mechanical pretreatment with sand and grit removal, biological treatment with the elimination of carbon and to some extent nitrogen as well as phosphor, and anaerobic sludge stabilization. The digester gas is used in gas engine driven ventilators for the aeration of the biological treatment. The cooling water of the engines in turn is used to heat the sludge. Especially the aeration system and the sludge stabilization showed significant savings potential.

After data collection and analysis, the present power consumption was evaluated. Based on this, measures to save energy were proposed, which were checked for plausibility and practicability, and weighted according to their cost efficiency. Recommendations were given for measures which would require more investment and/or detailed planning, but which should add to a considerable reduction of energy consumption.

ClientBrianzacque S.r.I., Italy
LocationMonza, Italy
Services Period2011 – 2012
Project Costmillion EUR
Technical Data
  • Population Equivalents
700,000 PE
  • Dry weather flow
225,000 m³/d
  • Maximum peak flow
900,000 m³/d
  • Design load
47,700 kg/d
Services
  • Advisory Services
  • Data collection and determination of the current energetic situation of the WWTP
  • Evaluation of the current situation based on reference values and development of possible saving measures
    complemented by a list of possible further actions
  • Summarizing report on findings and recommendations and a final presentation of results to the client

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…