Water

Tanzania, Water and Sanitation Upgrading Programme for 3 Towns

The project “Provision of pre contract assistance, site supervision and assistance during defects liability period for the upgrading programme for the towns of Kigoma, Lindi and Sumbawanga” (in short “3 towns construction supervision”) entails the construction of water supply and sanitation infrastructure as designed under the “7 towns urban upgrading programme”, executed during 2010/2011. more


Tunisia, Second Phase of the National Programme for Quality Improvement (PNAQ II), Feasibility Study

The project comprised a feasibility study for the rehabilitation and construction of 8 brackish water desalination plants in Southern Tunisia with analysis of plant powering options using renewable energy.more


India, Kerala Water Supply Project

The objective of this project is to provide new water supply systems and to rehabilitate water supply systems in two urban regions, Kozhikode and Thiruvanthapuram, as well as to construct completely new water supply systems for three rural regions, namely Pattuvam (Kannur District), Cherthala (Alappuzha District) and Meenad (Kollam District). more


Tanzania, 7 Towns Urban Upgrading Programme

The water and sanitation project covers seven urban centres in Tanzania. The overall objective of the program is to improve health, productivity and well being of the population residing in the urban areas and of the poor in urban and peri-urban areas. more


Algeria, Derivation plants and Transfers El Harrach to Douéra

The system is the core of the project to develop the irrigation perimeters for the central Mitidja plain covering 17,180 ha and includes recovering of water from Oued Harrach and filling up the Douéra dam. more


Uganda, Gaba III Water Treatment Plant

Construction of Gaba III water treatment plant, increasing the present potable water production from 120,000 m³/d to a total of 200,000 m³/d. more


China, Haikou Water Supply

To meet the increasing demand of water supply capacities and to prevent the groundwater level from falling, the existing Mi-Pu Water Works was extended from 75,000 m³/d to 240,000 m³/d. The treatment process included raw water intake works and transport pipelines, reaction and sedimentation tanks, a filtration plant, a disinfection and clear water pumping station with a chemical dosing plant.more


Displaying 8 to 14 of 14
<< First < Previous 1-7 8-14 Next > Last >>

NEWS

April 18th, 2024

We are excited to be part of #IFAT Munich

We are excited to be part of #IFAT Munich – the World's Leading Trade Fair for #Water, #Sewage,…

April 1st, 2024

Transition in management at GKW Consult

After a long career of almost 40 years, Dr. Christoph Theune retires on 31st of March 2024.…

January 29th, 2024

“La Atarjea” Wastewater Treatment Plant

GKW Consult GmbH (GKW) and its local consortium partner Agua Energía y Minería (AEM) (former…