Burkina Faso, Water Supply System Ziga II, Ouagadougou

Treatment Plant

The construction supervision project Ziga II has been executed in two phases, aiming atincreasing the water production and treatment capacities from the Ziga dam, situated 49 km north-east of Ouagadougou.

Services

  • Full provision of services as FIDIC Engineer 
  • Review of tender documents
  • Tendering and contract negotiation
  • Supervision of construction, incl. approval of construction drawings, inspection and quality control, installation and commissioning, payment certification, site administration.
  • Staff training

Technical Data

  • Inhabitants: 6,000,000 
  • Volume: 250,000 m³
  • Clear water production: 22,500 l/s
  • Pump apacity: 1,500 l/s
  • Storage capacity: 12,000 m³
  • Water main diameter: 1,200 -1600 mm

Client / Financing Agency

ONEA, Ouagadougou, Burkina Faso / AFD France

Services Period

2015 - 2019

NEWS

April 18th, 2024

We are excited to be part of #IFAT Munich

We are excited to be part of #IFAT Munich – the World's Leading Trade Fair for #Water, #Sewage,…

April 1st, 2024

Transition in management at GKW Consult

After a long career of almost 40 years, Dr. Christoph Theune retires on 31st of March 2024.…

January 29th, 2024

“La Atarjea” Wastewater Treatment Plant

GKW Consult GmbH (GKW) and its local consortium partner Agua Energía y Minería (AEM) (former…