China, Haikou Water Supply

To meet the increasing demand of water supply capacities and to prevent the groundwater level from falling, the existing Mi-Pu Water Works was extended from 75,000 m³ /d to 240,000 m³ /d.

The treatment process included raw water intake works and transport pipelines, reaction and sedimentation tanks, a filtration plant, a disinfection and clear water pumping station with a chemical dosing plant.

To strengthen the capacity of the Haikou Water Company in the field of network management and leak detection services were rendered for the training programme aiming at the operation and maintenance of the imported leak detection equipment, know-how transfer in terms of network management, water loss calculation and water quantity balance.

ClientFinance Department of Ministry of Finance (MOF), China
Financing AgencyKfW, Germany
LocationHaikou, China
Services Period1995 - 2002
Project Cost30 million EUR
Technical Data
  • Service population
750,000 capita
  • Service area
96 km²
  • Capacity extension
75,000 m³/d - 240,000 m³/d
  • Peak flow
13,500 m³/h
Services
  • Review and adjusting basic data of design, detailed design
  • Preparation of tender documents, tendering and tender evaluation
  • Assistance in contract award, construction supervision and commissioning
  • Training program on the operation and maintenance of the imported leak detection equipment and know-how transfer

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…