Uganda, Gaba III Water Treatment Plant

Gaba III Water Treatment Plant

The extra production capacity will provide relief from the general water shortage in the area. It is estimated, that this extra production capacity will cover the projected water demand of the coming 5 to 10 years. It will particularly improve the water supply to the low income housing areas.

ClientNational Water and Sewerage Corporation, Uganda
Financing AgencyKfW, Germany
LocationGaba, Kampala, Uganda
Services Period2002 – 2013
Project Cost145 million EUR
Technical Data
  • Clear Water Production
925 l/s
  • Raw Water intake
1065 l/s
Services
  • Review of contractors designs and preparation of environmental impact assessment report (pre-construction period)
  • Supervision of Construction (Construction period) and
  • Superintendence over the one year Defects Liability Period

NEWS

August 2nd, 2024

Signing of the World Bank funded Design, Management & Supervision Consultancy (DMSC)

On the 31st July 2024 GKW signed the World Bank funded Design, Management & Supervision Consultancy…

July 2nd, 2024

Christoph Grass becomes managing director of GKW Consult in July

As of July 2024 Christoph Grass has taken over the position of the Managing Director at GKW Consult.

May 17th, 2024

GKW Consult at the IFAT Munich 2024

From May 13th to 17th, GKW Consult GmbH and GFA Consulting Group, both members of the GFA Group,…