The main objective of the project was to improve the living conditions of the residents of Kampala through the provision of safe and reliable water supply. Package 4B consists of a new Drinking Water Treatment Plant (DWTP) east of Kampala near the village of Katosi as well as a bulk Transmission Main (TM) from Katosi to GKMA's distribution network. The works were carried out in three phases, and included pre-chlorination, pH adjustment, coagulation, flocculation, clarification, filtration, disinfection, sludge treatment including chemical dosing/storage, sludge treatment, and SCADA.

Location

Kampala

Services

  • Critical review of the Package 4A feasibility study and water supply and sanitation masterplan to determine which solution to proceed with;
  • Topographical and geotechnical survey including Bathymetric Survey;
  • Preparation of conceptual designs for the WTP, pumping mains and storage/balancing reservoir;
  • Preparation of tender documents and specifications - design-build;
  • Preparation and implementation of concise and specific environmental and social impact assessment;
  • Construction supervision and superintendence over the defect notification period.

Technical Data

  • Ultimate drinking water capacity: 240,000 m3/d
  • Water abstraction pipeline (ND 1,500 mm): 530 m
  • Raw water pumping station: 160,000 m3/d
  • Drinking water pumping station (2 no.): 80,000 m3/d
  • Drinking water pumping main (ND 1,200mm): 9.55 km
  • Reservoir volume (6 no.): 10,000 m3

Client / Financing Agency

NWSC – National Water and Sewerage Corporation / KfW Entwicklungsbank

Services Period

2016 - 2022

NEWS

April 18th, 2024

We are excited to be part of #IFAT Munich

We are excited to be part of #IFAT Munich – the World's Leading Trade Fair for #Water, #Sewage,…

April 1st, 2024

Transition in management at GKW Consult

After a long career of almost 40 years, Dr. Christoph Theune retires on 31st of March 2024.…

January 29th, 2024

“La Atarjea” Wastewater Treatment Plant

GKW Consult GmbH (GKW) and its local consortium partner Agua Energía y Minería (AEM) (former…