Banner

Desalination

DE_IN_Proposal for the Construction of 400 MLD Capacity Seawater Reverse Osmosis Desalination Plant

Construction of the Perur Seawater Desalination Plant DSP (400 MLD) Construction of Pumping Stations and Reservoirs with total capacity of 19ML Construction of product water transmission system with total length of 65km (DN 2000, 1800, 1600 and 1000mm) Improvement of the  existing distribution system in Chennai Core City with total length of 734km (DN 100-700mm) Installation of external power transmission line with total length of 15km mehr


NEWS

02.07.2024

Christoph Grass startet ab Juli als Geschäftsführer der GKW Consult

Anfang Juli 2024 hat Christoph Grass die Position des Geschäftsführers bei GKW Consult übernommen.