Kingdom of Saudi-Arabia, Wastewater Treatment Plant Al Khumrah
Field of Activity: Wastewater Collection & Treatment

Kingdom of Saudi-Arabia, Wastewater Treatment Plant Al Khumrah

Al Khumrah is the largest existing WWTP site, located in the southern part of Jeddah City in the industrial area of Al Khumra District. It consists of 4 existing phases with a combined capacity of approx. 250,000 m³ /d.

The WWTP Al Khumrah 2 (AK2) was commissioned in 1998 and was designed for a hydraulic capacity of 60,000 m³ /d and a BOD load of 320 mg/l.

The treatment process consist of screening, aerated grit removal chambers, surface aeration, sedimenation and sludge thickening and de-watering via belt filter presses. It utilizes an activated sludge process.

The WWTP Al Khumrah 3 (AK3) was commissioned in 2004 with a design capacity of 140,000 m³ /d and currently receives approx. 125,000 m³ /d. The treatment process consists of screens, aerated grit chambers, aeration, chlorination and sludge dewatering via belt filter presses.

The purpose of this project was to prepare the detailed designs and tender documents for the rehabilitation of the aeration system in AK3 WWTP.

The Consultant prepared all the related technical specifications, design drawings, BOQ and other necessary documents that will enable the interested contractors to tender for the rehabilitation works and subsequently implement the work.

Services

  • Review of available design data and as built drawings for the existing system
  • Method statements for decommissioning the existing system
  • Detailed design
  • Preparation of technical specification and tender documents
  • Detailed design of a new tertiary treatment system for water reuse according to new PME standards
  • Preparation of conditions of contract, specific and general specifications and drawings
  • Technical support during tendering and construction stage

Technical Data

  • Total treatment capacity: 250,000 m³/d
  • Preliminary treatment (screening & grit removal)
  • Biological treatment by aeration mixers (AK2)
and fine bubble aeration (AK3)
  • P-Removal (precipitation)
  • Final clarifiers
  • Tertiary treatment (disk filtration)
  • UV-Disinfection
  • Sludge thickening and sludge dewatering
  • Sludge handling silos for truck unloading
Project Facts
Location Jeddah, KSA
Client National Water Company, KSA
Service Period 2012 – 2013