The Sewage Pre-treatment Plant (SPP) in Fortaleza consists of preliminary treatment (screening, grit chamber, sludge presses) prior discharging the effluent into the sea via a submarine outfall. In compliance with the new Brazilian regulations, the existing SPP’s treatment process had to be retrofitted to meet “a minimum removal efficiency of 20% of total suspended solids” after grit separation. In addition, the existing SPP presented high costs in its operation both for the consumption of electrical energy, as well as for the removal of sand and solid waste due to low levels of mechanization; and problems in terms of odour control in all stages of the treatment process.
The services scope considered the preparation of a Conceptual Design and a Basic Design for the implementation of new treatment processes of the SPP, as well as enhancement of the existing processes, focusing in energy efficiency and improvement of the infrastructure and operation.