The Wastewater Treatment Plant (WWTP) La Atarjea, to be located to the east of the existing drinking water treatment plant in the city of Lima, will receive the wastewater from Carapongo, Santa Maria of Huachipa, Ate-Santa Anita and Cajamarquilla, all of them town districts of Lima. The treatment capacity was designed for 870.000 PE (design horizon 2028) and the required space was reserved for extending the capacity up to 1.2 million PE at the final stage (2038).
The facilities cover full mechanical and biological treatment, tertiary treament, sludge thickening, dewatering and anaerobic digestion with CHPU energy recovery for approx. 30% of total energy consumption. The plant includes screening, grit and grease removal, primary sedimentation, cascade pre-DN activated sludge system, final sedimentation, disk filtration (10 µm), UV disinfection, sludge thickeners (gravity and mechanical), anaerobic mesophilic digestion, biogas treatment line, CHP units energy recovery and mechanical sludge dewatering. Odour treatment is performed using decentralized photoionization units.