The main objective of the project was to improve the living conditions of the residents of Kampala through the provision of safe and reliable water supply. Package 4B consists of a new Drinking Water Treatment Plant (DWTP) east of Kampala near the village of Katosi as well as a bulk Transmission Main (TM) from Katosi to GKMA’s distribution network. The works were carried out in three phases, and included pre-chlorination, pH adjustment, coagulation, flocculation, clarification, filtration, disinfection, sludge treatment including chemical dosing/storage, sludge treatment, and SCADA.

Field of Activity: Water Supply
Uganda, Kampala Water – Lake Victoria Water and Sanitation, Package 4B (Drinking Water Treatment Plant Katosi)
Services
- Critical review of the Package 4A feasibility study and water supply and sanitation masterplan to determine which solution to proceed with;
- Topographical and geotechnical survey including Bathymetric Survey;
- Preparation of conceptual designs for the WTP, pumping mains and storage/balancing reservoir;
- Preparation of tender documents and specifications – design-build;
- Preparation and implementation of concise and specific environmental and social impact assessment;
- Construction supervision and superintendence over the defect notification period.
Technical Data
- Ultimate drinking water capacity: 240,000 m3/d
- Water abstraction pipeline (ND 1,500 mm): 530 m
- Raw water pumping station: 160,000 m3/d
- Drinking water pumping station (2 no.): 80,000 m3/d
- Drinking water pumping main (ND 1,200mm): 9.55 km
- Reservoir volume (6 no.): 10,000 m3
Project Facts
Location Kampala
Client NWSC – National Water and Sewerage Corporation / KfW Entwicklungsbank
Service Period 2016 - 2022